On September 21, Tra Vinh Wind Farm has completed energizing to begin commercial operation in the beginning of October 2021. Korea-Tra Vinh Wind Farm V1.1 was inaugurated in May 2020, covering 1,200 hectares of sea surface and land area. It has 12 turbines with a capacity of 48MW, stretching across 4.2km access bridge and producing 155 million kW of electricity annually. The above photo is the access bridge that holds the power cables designed by DKE in early work stage in 2019.