![](https://usercontent.one/wp/dkengineeringltd.com/wp-content/uploads/2022/11/Lobby-02-Minh-Khai-Station-300x180.png?media=1660798860)
After contract on ECS Operation and Maintenance (O&M) Manual under Hanoi Pilot Light Metro line in 2020, DKE signed the Purchase Order with Colas Rail in September 2022 on update O&M Manual/ PCP part and Training service of ECS system – Elevated Station of the Hanoi Pilot Light Metro Line